To develop and operate recycling plants for durable goods

That is the mission, word for word. Underneath sit three pillars that apply in this order — and that sometimes pull against each other.

Three pillars

What we weigh against each other

Müller-Guttenbrunn staff dismantling electrical appliances by hand on a sorting line
© Müller-Guttenbrunn Gruppe

01 / 03

Social responsibility

Communication carries the highest priority for us — with authorities, take-back systems, suppliers and above all our own staff. A recycling plant is a neighbour, not an anonymous industrial site. Anyone who wants to know what happens behind the fence gets an answer.

Müller-Guttenbrunn Group plant in Amstetten with its own rail siding, scrap yard and the hills of the Mostviertel behind
© Müller-Guttenbrunn Gruppe

02 / 03

Environmental responsibility

Every additional separation stage saves energy and CO₂ compared with producing new raw materials. At the same time the plant has to respect local environmental concerns — noise, dust, traffic. Depth of recycling is not an end in itself but the way to reconcile the two.

Processed non-ferrous metal concentrates produced by MGG Metran
© Müller-Guttenbrunn Gruppe

03 / 03

Economic viability

Without market intelligence, sound material knowledge and the best available technology, material cannot be returned to the loop for long. A separation stage that does not pay is switched off after a while — and then the loop gains nothing.

A material that is burned or landfilled today is no longer available to any future generation.

From the Müller-Guttenbrunn Group’s own position

Benchmark

Sustainability as we understand it

The Brundtland definition is not a slogan on the wall here but the test we apply to investment decisions.

“Development that meets the needs of the present without compromising the ability of future generations to meet their own needs.” Applied to a recycling business, that means one thing above all: a material burned or landfilled today is no longer available to any future generation.

So the question with every new plant is not only whether it pays, but which material it returns to the loop that would otherwise be lost. With plastics from electrical waste that calculation took years. With photovoltaic modules we are in the middle of it right now.

Tell us what you have.

Whether you are delivering material, buying secondary raw materials or need a disposal route for an entire plant — send us the details. We usually reply the same working day.

Call Enquire
+43 7472 64181-0